Devise a preliminary control scheme for the sections of the nitric acid plant seen below. Make a practice HAZOP study with at least three process parameters, e.g. T, P, F, L, etc. of each section listed below and revise your preliminary control scheme. a. Waste-heat boiler (WHB) b. Condenser c. Absorption column